Challenge
The challenge was to complete reviews of the current client installation manuals and generate detailed workpack documents for the Wind Energy Converter AREVA M500.
Solution
- Prerequisites document
- Gap analysis of existing installation manuals
- HAZOP study
- Generate Offshore Workpacks in a format that has been proven in the field both on and offshore incorporated with the installation procedures
- PPE Requirements document
Results
- Gap analysis of existing installation manuals highlighting key areas
- Completed documentation approved by client
- Successful onshore trial use of the workpacks
Maximising our value
- Key areas for review highlighted to customer based on 3sun Group construction knowledge
- Successful use of the Workpacks during onshore trials and offshore construction